BRITANNIA VILLAGE HEALTH CENTRE

Client
Kier Regional Ltd

Contract value
£350,000

Description of works
Kier appointed Mossford Construction to undertake the external and internal refurbishment of Britannia Village Health Centre.

External works
Installation of new CCTV system, block paving works and new front entrance Automatic opening system.

Internal works
Complete strip out, new plasterboard stud partitions and suspended ceilings. Install new stainless steel ironmongery, sanitary ware, furniture to clinical rooms i.e. cupboards, drawers, cabinets, worktops, shelving. DocM washroom.

M&E
Installation of new central heating, new hot & cold water supplies, design and installation of ducted extract ventilation system, automatic door system, fire alarm and detection , installation of panic alarm system, air-con, fresh air supply, heat recovery units, security alarm, staff attack system, 3 phase electrical distribution system, air curtain, flood wiring for data and voice, provision of server and patch panel, extensive electrical alterations.

Construction detail

 

  • Fixtures & fittings

  • Suspended ceilings

  • Doors & metal glazing

  • M&E installation

  • Decorations

  • Form openings

  • Floor coverings
     

deskInside
cabinetDetail
calorifierSink
consultBasin
docMWC
floorDetail
examLight
staffKitchen
wallDecs
floorChange
extAirCon
slop
Cut & carve
Cut and carve
Demo soft strip, making good
Main contracting
Main contracting
Multi trade subcontracting
Multi trade
Passive fire protection
Fire collar
Secondary steel
Welfare & site setup
Welfare & site setup
About us
About us
Contact us
Contact us
Accreditations
Accreditations
Show More

110 High Road

Loughton

IG10 4HJ

Tel: 0208 508 6060

© 2017-2020 Mossford Construction Co Ltd